|
|
|
CERAMIC
FIXING INSTRUCTIONS
LIMESTONE
FIXING INSTRUCTIONS
POLAR RIVA
FIXING INSTRUCTIONS
PORCELAIN
TILE INSTRUCTIONS
SLATE
FIXING INSTRUCTIONS
MAINTENANCE
GUIDE
Below are the same guides in Polish (polski)
LIMESTONE
FIXING INSTRUCTIONS in Polski
POLAR RIVA
FIXING INSTRUCTIONS in Polski
PORCELAIN
TILE INSTRUCTIONS in Polski
SLATE
FIXING INSTRUCTIONS in Polski
:: POLAR RIVA FIXING INSTRUCTIONS ::
Fixing instructions for Polar/Riva on to Suspended Timber Floor with Electric wire under floor heating
1 Ensure that Joists, floor boards, Waterproof ply, Tongue and grove etc are stable without
excessive movement, screwed down, dust free and dry.
2 Cut Ditra matting to fit area then fix using Ditra Adhesive. Ensure sheets are overlapped and
a kerdi matting skirting is used if the area is to be water proof.
3 Apply single part rapid flex white adhesive to the Ditra matting to create a level screed 2mm
above the Ditra matting. Allow to dry.
4 Fix the under floor heating as per manufacturers instructions & test. Ensure that none of the
heating elements are in contact with matting.
5 Fix the Tiles with a minimum 2 mm joint using single part rapid flex white adhesive using a notched
trowel to create a 4 mm bed, the adhesive bed must not exceed 6mm. Riva is a conglomerate of limestone
and resin so the fitting instructions must be adhered to, to insure the product will meet its
performance targets. Again ensure if fitting underfloor heating that none of the heating elements
are in contact with the tile. Allow to dry.
6 Apply one thin coat of MN Stainstop to tile , after 15 mins remove any excess with a dry cloth.
7 Grout using a flexible floor grout.
8 Clean and set up a regular maintenance programme.
9 Do not switch on the under floor heating on for at least 2 weeks and then only increase the
temperature above room temperature by 2 degree increments per day until the desired temperature
has been achieved.
Fixing instructions for Suspended timber floors or floors where there is a mix of substrates,
cracked old screed, green screed or water pipe underfloor heating systems
As above omit points 3 & 4 i.e. creating a screed etc, apply adhesive to the matting using a
notched trowel and fix tile immediately to create a 3 mm bed above the matting. Follow points
6, 7, 8 & 9.
Fixing instructions for Screeded Floors with/without under floor heating
As above omit points1, 2, 3 & 4 i.e. creating a screed etc. apply adhesive direct to a primed screed
using a notched trowel, and fix tile immediately to create a 3 mm bed. Follow points 6, 7 & 8
N.B. New Screeds should dry out or cure before tiles can be laid; industry recommendation is 25
mm per week, otherwise use ditra matting as above.
Fixing instructions for walls areas i.e. plaster/plasterboard, ply, backer board & render
As above omit points1, 2, 3 & 4 apply adhesive direct to a primed surface using a notched trowel
and fix tile immediately to create a 3 mm bed (the bed should never exceed 6mm). This product is not
suitable to be fitted to a skimmed plaster or render. Follow points 6, 7 & 8.
N.B. That although Polar and Riva have a very low absorption (less than 1 %) making them resistant
to staining, they are 98 % marble dust so they will be affected by strong acids & alkalis such as
Strong detergents, bleach etc.
|
|